Complexo Atualli - EPTG
SHVP Conjunto 2 Lote, 1 - Complexo Atualli · 0.0 km
🔌 Slow · 23 kW · Type 2 (socket)
SHVP Conjunto 2 Lote, 1 - Complexo Atualli, Brasília, DF
| Address | SHVP Conjunto 2 Lote, 1 - Complexo Atualli, Brasília, DF |
|---|---|
| Type of location | Not reported |
| Network / operator | Yellotmob (Brasil) |
| Charging type | Slow charging (AC) |
| Connectors | Type 2 (tethered) |
| Maximum power | 23 kW |
| Charging points | 2 |
| Price | Not reported |
| Last updated | 11/09/2026 |
| Source | Open Charge Map |
No check-ins yet. Charged here? Let other drivers know.
Community-sourced information: confirm conditions on site before charging. Data: Open Charge Map (CC BY 4.0).
Are you responsible for this station? Update photos, price, hours and amenities for free.
Update this stationMake the most of charging time: shops and services within walking distance.
Places: © OpenStreetMap contributors (ODbL), updated 11/07/2026.
SHVP Conjunto 2 Lote, 1 - Complexo Atualli · 0.0 km
🔌 Slow · 23 kW · Type 2 (socket)
St. Hab. Vicente Pires Chácara 109 - Taguatinga · 1.2 km
⚡ Fast · 60 kW · CCS2
Supermarket · Rua das Carnaúbas, 0 - Norte (Águas Claras) · 1.3 km
⚡ Fast · 40 kW · Type 2 (socket), CCS2
Supermarket · Rua das Carnaúbas, 0 - Norte (Águas Claras) · 1.3 km
🔌 Slow · 23 kW · Type 2 (socket), Type 2 (tethered)
· 1.3 km
🔌 Slow
Park / attraction · AV PARQUE ÁGUAS CLARAS LT 1405 · 1.6 km
🔌 Slow · 7 kW · Type 2 (tethered)